Pad Certification Report
Pad Certification Report – must be submitted prior to the foundation inspection:
o Must be prepared, signed and sealed by a Nevada registered engineer.
o Must be submitted to the Building Department Engineering Group for approval/clearance.
o A pad certification inspection must be requested after
Not Required | Medium | 06/13/2019